When it comes to smooth surfaces, Level 5 refers to the smoothest drywall finish you can get. Whether it’s smooth, bumpy, popcorn, or hand-applied, the drywall texture is ultimately what the surface of your walls and/or ceilings will look like after skim coating. The final finish on the surface of the walls is called the texture. Often this requires filling in small gaps that developed, which requires additional drying and sanding time. Once that has dried, workers need to once again go over every surface to ensure it’s completely smooth. Then once again, there will be a period of drying time, which, in the best case scenario, would be a minimum of one full day. Once again, all surfaces of the walls and ceilings will need to have compound applied smoothly and uniformly. This requires workers to once again go over every inch of drywall surface area sanding by hand.Īfter that is done, a different product is used to begin adding the actual skim coat layers. When South Austin Drywall does skim coat estimates, we clearly state the required time frame including the drying days.Īfter the initial layer of compound has dried, then the work begins to sand and smooth it out. Humidity levels can greatly effect this making it difficult to schedule when workers need to return. Once that process is completed, the initial drying process begins. Depending on the size of the home and number of workers, this can take several hours or days. One full coat of compound needs to be smoothly applied to every inch of drywall surface area. There are different products required for each part of the process, but we won’t get into specifics here. Now the actual process of skim coating begins with applying the first layer of drywall compound. Starting with a relatively flat surface requires less passes with compound, which can provide a better final result. It’s important to remember that the foundation you begin with will determine the difficulty and final results of the skim coating process. This can sometimes be necessary when homeowners want a smooth Level 5 drywall finish, but the existing drywall is near the end of its life In worst case scenarios, most or all of the drywall in the home would need to be completely removed and reinstalled. In certain instances, older drywall may need to be demoed and replaced. Sometimes these drywall repairs can become very extensive. This would also include any sanding to remove popcorn texture. Often times, this would include fixing any cracking throughout the home, repairing or replacing damaged drywall panels, re-screwing and reattaching any loose or sagging drywall, and any other repairs. Since the masking, taping, and other prep work is the same, it makes the most sense to only do it once.Īfter all areas are prepped, ladders and scaffolding are set up, and materials are purchased and ready, then any and all drywall repairs need to be done. Any mistakes can result in damages to your home or possessions.Īccuracy with skim coat preparation is also very important because generally, the next process after you resurface all your walls and ceilings would be to paint. Every area that is not going to get skim coated will need to be fully protected, and lines need to be taped precisely along all edges. Depending on the number of workers, this portion can take from several hours to multiple days. Once all furnishings are removed from the home, then the extensive process of taping, masking, and protecting the floors can begin. Especially when it all needs to remain covered to protect it from dust and drywall compound. Continuously moving furniture from one side of the room to the other isn’t a fun process. People often think that everything can be pushed to the center of the room and covered, but this is generally not the case.Īs you go over the ceiling area, you need to continually move the ladder or scaffolding to be underneath the section being worked on. This means that all photos need to be removed from the walls and all furniture needs to be taken out. When you skim coat, you are going over every surface of the walls and ceilings multiple times. The first part that many homeowners often overlook is that pretty much everything needs to be removed from the rooms/home. When skim coating an entire home, or even a single room, this is accomplished by extensive preparation.ĭepending on the number of people doing it, prepping an entire 2000 square foot home can take days. Anyone that’s ever painted anything before knows how important it is to stay within the lines.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |